MAILLIS industry with Natural Gas combustion substitudes the consumed electricity for plastic formation, though with the engines jacket heat recovery, cool water is produced for the cooling of the final products and with the produced steam through the exhaust system opearate the PICLING unit of the sheetmetal shop.
PROJECT: | BUILDING COGENERATION OF ELECTRICITY-HEATING AND COOLING IN MAILLIS INDUSTRY |
END USER: | M.J. MAILLIS SA |
START-UP YEAR: | 2001 |
ENGINE TYPE: | GE WAUKESHA, VGF P48GLD 700KW |
CHILLER TYPE: | LG CABLE 340RT, SINGLE STAGE HOT WATER |
STEAMER TYPE: | CLAYTON 500ΚG/HR, 8BARG |
APPLICATION: | TRIGENERATION IN INDUSTRY |
FUEL: | NATURAL GAS |
LOCATION: | CONTAINER |
POWER | ELECTRIC POWER: 2,100KW, STEAM POWER: 1,100KW, COOLING POWER: 340RT |