Cooling and Heating of the Hospital with Natural Gas combustion in a two stage chiller-burner.
| PROJECT | COOLING WITH NATURAL GAS IN “IASO GENERAL” HOSPITAL |
| END USER: | IASO GENERAL HOSPITAL |
| START UP YEAR: | 2007 |
| CHILLER TYPE: | LS MTRON 360 RT, TWO STAGE WITH BURNER |
| APPLICATION: | HEATING-COOLING OF THE HOSPITAL |
| FUEL: | NATURAL GAS |
| LOCATION: | ROOF |
| POWER: | 360RT |