Heliostat Ltd is an innovative company, leader in the field of energy in Greece, operating for more than 30 years.
Its main milestones are:
1981
- Heliostat Foundation
1982
- Award at international competition in U.S.A. for Construction of Big Scale Solar Air conditioning Project.
1983
- Design & Construction of first solar residence in Chios Island, Greece.
- First co-operation with General Electric for Solar products.
1984
- Construction of Phase I of Solar Air conditioning Project.
1986
- Construction of Phase II of Solar Air conditioning Project.
1987
- Implementation of the first Commercial Co-Generation Project for Buildings in Europe (400 KW of electricity, 50 RT refrigeration).
1992
- Design of the first Co-Generation Project with natural gas in the Industry sector (2,1 MWel,300 RT).
1998
- Exclusive Representatives of “LG Cable” (Korea) in Greece, now known as “LS Cable”.
2000
- Construction of the first Project of Co-production with natural gas in Industry sector (2MW of electricity, 340 RT refrigeration).
2002
- Installation of the first Absorption Chiller (natural gas) in a Hotel. Capacity 120 RT, Hotel CENTRAL, Athens.
2003
- Distributor of ” Dresser-Waukesha” for Greece & Cyprus.
- Installation of the first Absorption Chiller (propane gas-LPG) in the Industry.Capacity 100RT, “PETROGAZ SA”, Aspropyrgos.
- Construction – Supervision – Co-ordination of Project “Sea Water Cooling in the municipality of Hydra”, Hydra Island.
2004
- Installation of the first Absorption Chiller (natural gas) in a Hospital. Capacity 480 RT, IASO SA., Athens.
2005
- Exclusive Representative of “PIOVAN” Italy Natural gas PET Drying Systems.
- Installation of the fist gas drying units in the Industry. Capacity 600 KW, “COCA-COLA SA”, Schimatari.
- Installation of the first Absorption Chiller (natural gas) in a Public Building.Capacity 240 RT, new Town hall of Peristeri, Athens.
2006
- First Alternative Fuel Co-Generation unit (landfill gas).
Capacity 1.4 MW, Volos. 2007
- Installation of the largest cooling unit in Greece.Capacity 2*560RT at IASO Hospital.
- Installation of an absorption chiller. Capacity 360RT at IASO General.
2008
- Installation of two absorption chillers at Great Britain Hotel. Capacity 2*320RT.
- First installation of cogeneration in a hospital. Electrical power 490KW, Heat recovered 890ΚW and Cooling capacity 190RT.
2010
- First application of Energy OutsourcingTM under ALPHA LEASING financing.
2012
- Distributors of General Electic – Waukesha for engines and services
- Operation of 2MW CHP unit in Golden Hall mall.
2013
- Co-operation with Athens HILTON Hotel.
2014
- Selection of two Waukesha VGF P48 GLD 700KW engines by ERGOTEM SA on the first Public bidding on CHP application at 251 Airforce General Hospital.
- Co-operation with Shuangliang Eco -Energy Systems Co. Ltd in Absorption Cooling Technologies.